Smartphone Building

Research progress

Snapshot 2026-10-23 18:35 UTC. Denominators cover the discovered inventory at revision 138, not every requirement the project will eventually uncover.

1499discovered outputs
1469not researched
10inherited notes
734bounded draft routes
MeasureCurrent valueMeaning
Discovered but unresearched1469/1499 (98.0%)Items with no recovered making page or new research.
Inherited pages10Prior conceptual notes with known inventories; not source-checked this turn.
Research drafts / source-checked / reviewed / experimentally demonstrated16 / 0 / 4 / 0Technical research, separate from graph software tests.
Selected draft routes / dependency edges734 / 11345Cycle-checked structural links, with capability and inventory gaps.
Unexpanded physical outputs765/1499No selected making route; not natural endpoints.
Black-box software boundary records8Excluded from the physical research denominator; software development is outside scope.
Reviewed natural endpoints / closed manufacturing paths0 / 0Closure is calculated by the gate; physical acceptance is a separate claim.
Unselected seed relationship proposals803Older hypotheses; cyclic and alternative-mixing suggestions remain staged.
Declared selected cycles0Code validation succeeded; this is not a feasibility result.

What actually ends?

No reviewed natural endpoints yet. Native copper occurrence, natural water and host rock remain candidates with unresolved availability, recognition and acquisition.

Open frontiers

765 physical items still need a selected making route. Their individual pages show current unknowns. Software implementation records are excluded.

Browse all open items

Next research sequence

Freeze measurable flagship targets; research natural-resource acquisition and non-electrical coarse tooling; establish reference surfaces and earlier power; then trace copper, wire and speaker quality. Dedicated reviews cover glass, batteries, display, semiconductor tooling, physical control/loading interfaces and real-network compatibility.

Shared prerequisites to investigate for reuse

Counts show selected routes calling the same record, not available physical stock. Capability and build-order qualification are still required.

Code gate

21 adversarial checks passed for self-loops, multi-node and concurrent cycles, stale revisions, missing targets, false terminals, unreviewed capabilities, unspecified demands and atomic failure. Every generated dependency link is matched against the validated graph and its actual destination.

Read the gate guarantees and limits

Storage and publishing

The user has allocated about 25 GB on this computer. The build checks that local project and recovery files stay within that budget. Text, code and source links remain compact; cloud storage for larger attachments is undecided. The standalone edition remains usable offline; the private hosted edition supplies the same validated reading pages and a compressed standalone download.

Read the storage options