Research progress
Snapshot 2026-10-23 18:35 UTC. Denominators cover the discovered inventory at revision 138, not every requirement the project will eventually uncover.
| Measure | Current value | Meaning |
|---|---|---|
| Discovered but unresearched | 1469/1499 (98.0%) | Items with no recovered making page or new research. |
| Inherited pages | 10 | Prior conceptual notes with known inventories; not source-checked this turn. |
| Research drafts / source-checked / reviewed / experimentally demonstrated | 16 / 0 / 4 / 0 | Technical research, separate from graph software tests. |
| Selected draft routes / dependency edges | 734 / 11345 | Cycle-checked structural links, with capability and inventory gaps. |
| Unexpanded physical outputs | 765/1499 | No selected making route; not natural endpoints. |
| Black-box software boundary records | 8 | Excluded from the physical research denominator; software development is outside scope. |
| Reviewed natural endpoints / closed manufacturing paths | 0 / 0 | Closure is calculated by the gate; physical acceptance is a separate claim. |
| Unselected seed relationship proposals | 803 | Older hypotheses; cyclic and alternative-mixing suggestions remain staged. |
| Declared selected cycles | 0 | Code validation succeeded; this is not a feasibility result. |
What actually ends?
No reviewed natural endpoints yet. Native copper occurrence, natural water and host rock remain candidates with unresolved availability, recognition and acquisition.
Open frontiers
765 physical items still need a selected making route. Their individual pages show current unknowns. Software implementation records are excluded.
Browse all open itemsNext research sequence
Freeze measurable flagship targets; research natural-resource acquisition and non-electrical coarse tooling; establish reference surfaces and earlier power; then trace copper, wire and speaker quality. Dedicated reviews cover glass, batteries, display, semiconductor tooling, physical control/loading interfaces and real-network compatibility.
Shared prerequisites to investigate for reuse
Counts show selected routes calling the same record, not available physical stock. Capability and build-order qualification are still required.
- Containers — 378 routes
- Ventilation — 305 routes
- Workshop surfaces — 287 routes
- Cleaning equipment — 281 routes
- Dimensional instruments — 247 routes
- Chemical effluent collection equipment — 226 routes
- Temperature instruments — 192 routes
- Metalworking protection — 164 routes
- Chemical protection equipment — 163 routes
- Regulated power — 143 routes
Code gate
21 adversarial checks passed for self-loops, multi-node and concurrent cycles, stale revisions, missing targets, false terminals, unreviewed capabilities, unspecified demands and atomic failure. Every generated dependency link is matched against the validated graph and its actual destination.
Read the gate guarantees and limitsStorage and publishing
The user has allocated about 25 GB on this computer. The build checks that local project and recovery files stay within that budget. Text, code and source links remain compact; cloud storage for larger attachments is undecided. The standalone edition remains usable offline; the private hosted edition supplies the same validated reading pages and a compressed standalone download.
Read the storage options